SERVICE 01
Commercial kitchen design
A kitchen that sends the menu on the busiest night you can realistically expect, built inside the square footage and the budget you actually have.
Typical timeline
Four to nine weeks from survey to issued drawing set, depending on whether we are working with an empty shell, a change of use or a room that is still trading while we plan.
We start with the menu, not the room. Every dish is broken into prep steps, hold requirements and pass sequence, which tells us what equipment has to exist and where a cook has to stand. Only then do we place walls, drains and hoods.
You receive a drawing set your contractor can build from and your health inspector can read: dimensioned layout, equipment schedule with model numbers and clearances, utility rough in points with gas, water and electrical loads, ventilation and make up air strategy, plus finish schedules for floors, walls and ceilings that will pass inspection five years from now.
- Station by station motion and step count study
- Hood sizing, make up air and grease duct routing
- Cold and dry storage sized to delivery frequency
- Wash line and three compartment sink compliance
- Dimensioned plans, elevations and equipment schedule
- Utility load schedule for the mechanical and electrical trades
- Accessibility and egress review of the working areas
- Phased build options when the room must keep trading